The Hwy 14 study team has explored many options for improvements to the corridor. Evaluation of options included safety, congestion, access, walkability/bikeability and other considerations. Thorough analysis resulted in four final concepts for consideration. Each of the four concepts include new intersection treatments, applied in different ways. The intersection treatments include:

Visual Description of alternative features

Please provide your feedback on each concept below.